Preliminary supply list

Based on the CKD kit, it is sent to the markets and to the Logistic Operator by the CKD T.S. service, together with the BOM, 2 months before the programmed shipment of the CKD kits.
- an example of a Preliminary Supply List is attached.

Preliminary Supply List example